The participant funding process by the Canadian Environmental Assessment Agency for the proposed Bute Inlet Hydroelectric Project that is to come up in British Columbia is being postponed. The postponement is due to alteration in timelines related with the submission of the Environmental Impact Statement for the project.
Ultra Geothermal provides geothermal designing and installation services. The geothermal system, installed by the company, uses water in the deep standing column wells as the medium for heat exchanging. The well water is used to transfer the heat between earth and home. These deep standing wells also have the ability to provide potable water. Hence, the geothermal system offers hot water supply in addition to space heating and cooling.
At Neal Hot Springs project site, Chevron Minerals drilled and found commercial geothermal resource in a depth of 2,820 feet, during the late 1970s. The Chevron drill hole came upon massive lost circulation of drill fluids and high temperature in the geothermal zone.
The Whisper 100M marine wind turbine consists of three blades made of injection-molded fiber. The CE complaint wind turbine has a cast aluminum housing and comprises permanent magnet alternator. The rotor of the wind turbine has an overall size of 2.1 meters.
The US Department of Energy’s (DOE) National Renewable Energy Laboratory (NREL) released the Eastern Wind Integration and Transmission Study (EWITS), which is a two-and-a-half year technical study that examines high-penetration wind scenarios of the future. The Eastern Wind Integration and Transmission Study was designed to analyze the operational, technical and economic implications of moving Eastern Interconnection’s electrical load amounting to 20% or more to wind energy by the year 2024.
Torresol Energy has secured a US$760 million loan for the development of its Value 1 and Value 2 concentrated solar power (CSP) plants in Andalucía, Spain. Torresol Energy is a joint venture company between Masdar, a subsidiary of the Mubadala Development Company, and Sener, an international multidiscipline engineering company. The total investment is estimated to be US$1 billion for the two plants.
SunWize’s solar installation division, SunWize Residential Power Systems, has launched its second city-wide solar challenge in the capital of Oregon, Salem. The Solar Challenges are organized by the company to spur a city or town for accomplishing a substantial renewable energy goal.
Enel Green Power’s subsidiary, Enel North America, has signed an agreement with NRG Energy to acquire Padoma Wind Power, its wind development company. Both the companies have also closed a general co-investment agreement. Enel North America and ERG will assess other joint venture opportunities in the renewable energy sector. If Enel North America seeks a partner in Padoma projects in the future, NRG holds the Right of First Offer.
Researchers from the University of Virginia’s Department of Civil and Environmental Engineering have discovered that a number of significant environmental challenges should be successfully tackled before the production of fuel increases. These researchers recommend the usage of wastewater as a solution to address these challenges. The research was supported by ExxonMobile, who had invested $600 million last summer. An announcement was made by the US Department of Energy last week that an incentive of $78 million will be awarded for research and development of the biofuel.
The Raft River geothermal project was obtained in the year, 2002. U.S. Geothermal made a contract with the Idaho Power company to provide electricity up to 10 megawatts from the power plant of Raft River Unit 1 for 20 years. The Raft River Unit 1 has begun its commercial operations from January 2008 onwards.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.