The AIR-X marine wind turbine's body is made of powder coated aluminum and uses marine grade wiring, stainless steel hardware and water tight housing. It provides the highest power output and operates in less noise. Since the energy is derived from the wi
The UE 6 wind turbine is equipped with three blades, which are made of composite carbon fiber. Its swept area is 43sq.ft and the lateral thrust is 340nts. This wind generator incorporates a tilt governor, which has a speed of 27mph.
Morgan Solar, a solar energy start-up company in Toronto, has increased its first-round investment from the USD $4.7 million as announced in October 2009 to USD $8.2 million.
Solar Energy Initiatives’ 800 kilowatt project with the Canon City School District in Canon City, Colorado is completed and expected to be commissioned in January 2010. Solar Energy Initiatives is carrying out a grass roots campaign called “RENEW THE NATION”. The aim of this campaign is to redeploy a part of the US work force and to reduce the global dependence on fossil fuel by selling photovoltaic and solar thermal technologies.
Woods Hole Landholdings (WHLH) has announced that it has equipped the headquarters of Woods Hole Group with a solar panel installation. The company has teamed up with Beaumont Solar for the renewable energy project. The installation has utilized solar panels from Sun Power. At present, the solar panels from Sun Power are the most efficient panels available on the global solar market. The office building is headquarters for the Woods Hole Group Inc. and its subsidiary, the Woods Hole Group Middle East. The solar power system has 176 panels and occupies approximately 2,400 square foot of space on the roof.
Maryland’s single largest rooftop solar power installation was unveiled by Staples and SunEdison at Staples’ fulfillment center in Hanover. Staples is the largest office products company in the world and SunEdision is a subsidiary of MEMC Electronic Materials and largest provider of solar energy services in North America. The solar installation occupies nearly 175,000 square feet of roof space, which is bigger that three football fields. The rooftop solar installation has a capacity to generate 1.01 megawatt of power.
Solutia has been selected to supply its Therminol VP-1 synthetic heat transfer fluid for a new concentrating solar power plant, Solnova 4, in Sevilla, Spain. The 50-MW solar power plant, which is managed by Abener, is scheduled to commence operations in 2010. This plant will be located in Abener's Solucar Platform complex, where several solar plants will also be installed.
Middleton Geothermal Services provides testing services for geothermal project. The two geothermal testing services, offered by the company, are thermal conductivity testing, and High Density Polyethylene (HDPE) pressure testing. The thermal conductivity testing is conducted to measure the ability of a specific site to transfer heat. The thermal conductivity testing is essential in commercial geothermal projects. A commercial geothermal application may require large amount of heat transfer through the ground heat exchanger. The size of the heat exchanger is determined based on its efficiency.
MEG Geothermal is specialized in providing geothermal energy for residential and commercial heating and cooling. The company works with architects, developers, project owners, mechanical engineers, mechanical contractors, homeowners and builders to design and install geothermal systems for their projects. Site evaluation, drilling, ground heat exchanger designing, formation thermal conductivity testing and installation of geothermal system are some of the services offered by the company.
Mannvit Engineering offers geothermal development services for developing a geothermal power plant. The five phases involved in the development of a geothermal development plant are exploration and reconnaissance, pre-feasibility, feasibility, detailed design and construction, and operation and maintenance. The geothermal development service starts with the exploration and reconnaissance phase. This phase is undertaken to identify whether the location has enough geothermal resource that can be exploited commercially. First a desk study is conducted to collect the available data on the field.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.