The PERG project produces about 50MW of electricity for the city of Los Angeles. Simultaneously, it also reduces methane gas emissions considerably, allowing for a cleaner and safer region. Landfill gas that is produced by bacterial decomposition of wastes in landfills is utilized to produce electricity in the PERG project.
The UE 42 wind generator is available with a rated output capacity of 4,200W. The 4,200W output is produced through the rated wind speed of 27mph. The peak output of this wind turbine is 4,500W and the cut in rate of the wind speed is 6mph. This wind turbine provided by Eco-Technology Solutions includes blades, rotor, governor and an electronic controller.
The AIR industrial wind generator is available in lightweight design and requires minimum space. It is equipped with reinforced blades made of carbon fiber. This wind turbine provided by Discover Power incorporates an adjustable pitch having aeroelastic twist over-speed protection.
ITC Midwest LLC connected 716 megawatts of installed wind energy generation to the company’s electric transmission system during the year 2009 as part of its strategy to develop wind energy in the Midwest.
NextEra Energy Resources has expanded its product offering through the creation of US wind carbon offset credits - verified emission reductions (VERs). NextEra Energy Resources is a subsidiary unit of FPL Group and North America’s leading generator of wind power and it is also the first wind developer, owner and operator to produce and offer this specific type of carbon offset credit.
A major offshore wind farm development rights has been awarded to Vattenfall and ScottishPower Renewables in North Sea, off the east coast of England. The zone was assessed by both the companies for a period of 12 months for its potential and following that, the companies were awarded the development rights as part of The Crown Estate’s Round 3 offshore wind farm programme.
The Oklahoma Corporation Commission has issued two orders authorizing OG&E’s purchase of electricity from new wind farms that are at present being developed in northwestern Oklahoma.
An agreement was signed by William Paterson University (WPU), Nautilus Solar Energy, and SunDurance Energy to construct a solar power facility at the university’s campus in Wayne, New Jersey. The solar power project consists of rooftop and parking lot installations with a total capacity of 3.5 MW. When the project is completed, it will be the largest solar facility to be constructed at a university in the United States.
The UK division of Fluor Corporation, Fluor Limited, and SSE have been jointly awarded the exclusive rights to develop Round 3 offshore wind farm zone, which is located off the coast of Scotland, by The Crown Estate.
Nevada Geothermal Power, a developer of geothermal projects, is developing the Pumpernickel geothermal project. The project is located in the Humboldt County, Nevada. The project property covers an area of 10.34 square miles, and it is 100 percent leasehold. The site has access to the local transmission grid through three interconnect points. The project site is estimated to have a geothermal resource capable of producing 20 to 30 megawatts of power.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.