Posted in | News | Biofuels | Green Energy

WELTEC BIOPOWER Commences Construction of Central Hessia Biogas Plant

WELTEC BIOPWER, a German-based company engaged in the building of biogas plants, declared the construction commencement of the 1.5 MW Central Hessia biogas plant located within the municipality of Ebsdorfergrund.

WELTEC BIOPWER will supply the total gas feed-in and gas processing expertise required for the plant.

The gas processing technology-Unit Model of the 1.5 MW plant

The proposed plant in addition to having biogas processing facility will also have a separation plant to develop the digestate into organic fertilizer with increased level of solid matter to enable convenient storage and deportation. The plant is designed to process around 140 million cubic feet of biogas into natural gas. The chemical amine treatment proposed for use in the plant bonds the carbon dioxide held in the biogas to the cleaning agent amine and the process will increase the presence of methane in the biogas.

The increased level of methane presence in the biogas after the chemical treatment process cuts down the need to add conditioning gas in the feed-in plant. This feature improves the functional efficiency of the plant significantly. The company has adequate experience in implementing such process and the procedure fully addresses the issues related to maintaining the purity and methane slip.

The Central Hessia biogas plant was originated and designed by ALTUS a Karlsruhe, Germany- based company specialized in renewable energy technologies.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Chai, Cameron. (2019, March 01). WELTEC BIOPOWER Commences Construction of Central Hessia Biogas Plant. AZoCleantech. Retrieved on November 23, 2024 from https://www.azocleantech.com/news.aspx?newsID=14737.

  • MLA

    Chai, Cameron. "WELTEC BIOPOWER Commences Construction of Central Hessia Biogas Plant". AZoCleantech. 23 November 2024. <https://www.azocleantech.com/news.aspx?newsID=14737>.

  • Chicago

    Chai, Cameron. "WELTEC BIOPOWER Commences Construction of Central Hessia Biogas Plant". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=14737. (accessed November 23, 2024).

  • Harvard

    Chai, Cameron. 2019. WELTEC BIOPOWER Commences Construction of Central Hessia Biogas Plant. AZoCleantech, viewed 23 November 2024, https://www.azocleantech.com/news.aspx?newsID=14737.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.