Posted in | News | Solar Energy | Green Energy

Array Technologies Makes First Shipment of Solar Tracking Systems for 50 MW Project

Array Technologies, declared that it has completed the first shipment of its solar tracking systems meant for a utility-scale solar photovoltaic project being built by Recurrent Energy.

Solar Installation at National Renewable Energy Laboratories. Credit: Array Technologies

The 50 MW DC solar project is being developed for the Sacramento Municipal Utility District in southern Sacramento County, CA. Recurrent Energy, has chosen Swinerton Renewable Energy as the Engineering, Procurement and Construction contractor for the project.

The project is being developed in three sites such as Dillard (12 MW), Bruceville and Kammerer (19 MW each) in the Sacramento region. All the sites will deploy DuraTrack HZ tracking systems developed by Array Technologies. The Dillard site will incorporate a number of DuraRack fixed arrays to maximize the power generation and use the existing space. The DuraRack fixed systems are meant for use on variable terrain locations and its construction design cuts down the erection time by reducing the tolerance necessities and enables generation of power even in unfeasible locations.

Array Technologies is a producer of solar tracking systems and other linked products meant for the use of residential, commercial and utility level customers all over the world. The company supplies ground-mount racks, and horizontal single-axis trackers needed for the project. Recurrent Energy has chosen Array Technologies for its known product standing and bankability.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Chai, Cameron. (2019, March 01). Array Technologies Makes First Shipment of Solar Tracking Systems for 50 MW Project. AZoCleantech. Retrieved on November 26, 2024 from https://www.azocleantech.com/news.aspx?newsID=15686.

  • MLA

    Chai, Cameron. "Array Technologies Makes First Shipment of Solar Tracking Systems for 50 MW Project". AZoCleantech. 26 November 2024. <https://www.azocleantech.com/news.aspx?newsID=15686>.

  • Chicago

    Chai, Cameron. "Array Technologies Makes First Shipment of Solar Tracking Systems for 50 MW Project". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=15686. (accessed November 26, 2024).

  • Harvard

    Chai, Cameron. 2019. Array Technologies Makes First Shipment of Solar Tracking Systems for 50 MW Project. AZoCleantech, viewed 26 November 2024, https://www.azocleantech.com/news.aspx?newsID=15686.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.