Posted in | News | Electric Vehicles | Battery

IONETIC Reveals First Details of New £5 Million Battery Pack Production Facility in UK

Software-accelerated battery pack developer, IONETIC, has revealed the first details of an all-new £5 million smart battery production pilot facility in the UK.

James Eaton, CEO and Co-Founder of IONETIC (left); Andy Palmer, Chairman of IONETIC (right). Image Credit: IONETIC

Called Arc Fab Pilot, the phase one battery pack manufacturing plant in Brackley is set to be brought online in 2025 and has been designed to significantly slash the time-to-market and development costs for electric vehicles – reducing risk for automakers needing custom battery packs and providing a local approach to battery-pack manufacture in light of ongoing uncertainty affecting the EV sector.

The new 5000-sq-ft facility will also serve as IONETIC’s global HQ and industrialization centre, creating 30 high-skill jobs in its first phase. The £5 million Arc Fab Pilot facility will be fully-operational by Q3 2025, having opened in Q4 2024, marking a key step in IONETIC’s mission to provide specialist OEMs – such as those producing trucks, buses, off-highway and commercial vehicles – with a rapid, cost-effective route to high-quality, customized EV battery packs.

James Eaton, CEO and Co-Founder of IONETIC, said: With EV adoption accelerating, OEMs need effective, flexible battery solutions. By embedding agility into the core of our production model, we’re removing the most significant barriers to custom EV battery production; cost, time, risk and scalability. Arc Fab Pilot will be the first step towards unleashing the potential of our Arc technology stack, allowing us to produce custom battery packs at a speed and price point that the current market simply doesn’t allow for, from right here in the UK.”

With an initial investment of £5 million in 2025, Arc Fab Pilot underscores IONETIC’s commitment to making battery production faster, more flexible, and more affordable.

Unlike traditional production lines that are dedicated to one product type, the Arc Fab system can produce a variety of battery pack designs on a single line. IONETIC’s Arc technology stack can create optimized designs in days, a process that typically takes months, reducing upfront setup normally associated with custom EV battery pack development and production, slashing time-to-market by over 80%, enabling multi-million-dollar savings for OEMs. The Arc Fab Pilot Facility will use industry-leading automation hardware and integrated control systems from Rockwell Automation, as well as software such as Emulate3D platform to build comprehensive digital twins of IONETIC’s production facilities.

IONETIC’s technology creates a new middle ground in the EV battery market, bridging the gap between off-the-shelf solutions with compromised performance, and costly custom solutions viable only for the world’s biggest OEMs. IONETIC makes custom battery packs affordable and accessible for specialist manufacturers, a sector that generates £7 bn annually in the UK alone. “At a time when diversification in the EV battery pack market is more important than ever,” continues James Eaton, “our mission is to reduce compromises for our partners and make custom battery production accessible, adaptable, and aligned with the future of mobility.”

IONETIC is committed to building sustainability into the core of its business. Both the pilot facility and future Arc Fab 1 are scheduled to use certified zero-carbon electricity, as part of IONETIC’s strategy to achieve net-zero operations by 2030. This approach allows IONETIC to meet the needs of smaller, low-volume OEMs looking for affordable custom solutions while keeping their environmental impact low.

Key Facts and Figures:

  • Arc Fab Pilot Facility (Brackley, Northamptonshire)
  • Size: 5,000 square feet
  • Jobs Created: 30 in phase one
  • Launch: Operational in Q3 2025
  • Investment: £5 million GBP ($6.4 million USD) 
Source:

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    IONETIC. (2025, February 18). IONETIC Reveals First Details of New £5 Million Battery Pack Production Facility in UK. AZoCleantech. Retrieved on February 20, 2025 from https://www.azocleantech.com/news.aspx?newsID=35540.

  • MLA

    IONETIC. "IONETIC Reveals First Details of New £5 Million Battery Pack Production Facility in UK". AZoCleantech. 20 February 2025. <https://www.azocleantech.com/news.aspx?newsID=35540>.

  • Chicago

    IONETIC. "IONETIC Reveals First Details of New £5 Million Battery Pack Production Facility in UK". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=35540. (accessed February 20, 2025).

  • Harvard

    IONETIC. 2025. IONETIC Reveals First Details of New £5 Million Battery Pack Production Facility in UK. AZoCleantech, viewed 20 February 2025, https://www.azocleantech.com/news.aspx?newsID=35540.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.