The primary energy input required for the Enercab 250 from SCHMITT ENERTEC is 970kW. The space required to install this gasification unit has been measured as 18 x 9 (L x W). The wood gas produced with the help of this gasification unit is completely free from tar that also helps in the maintenance and efficient functioning of the combustion engine.
Savant Solar provides geothermal heating systems. The Direct Exchange geothermal heating system is specifically designed for areas with minimal space for pipe looping. This heating system utilizes short pipe looping that is installed below the ground level. It is this pipe looping through which the refrigerant is circulated. This is different from other geothermal systems where heat transfer fluid is used. The use of the refrigerant eliminates the need for additional piping as the heat is transferred between the ground and refrigerant.
Genica Energy helps developers and homeowners to adopt geothermal energy as an alternative source of energy. Genica Energy supports geothermal project developers with professional expertise for developing geothermal solutions. Genica Energy provides help to install geothermal heating and cooling units at home. Genica Energy helps the developers in all stages of the geothermal project development.
Borealis GeoPower is working on the development of a geothermal energy pilot project that involves using heated waste water. The project is being developed in an oilfield in the Canadian Foothills. The waste water from deep oil and gas wells will be used to generate electricity. This is a co-production research project, in which the company is involved. The project site comprises numerous deep end of life gas and oil wells that are readily available with hot water resource.
Governor Edward G. Rendell remarked that Pennsylvania’s position as a leader in energy innovation will be strengthened and about 170 fresh jobs will be created with the recent round of investments from the state’s Alternative Energy Investment Fund.
Geoscape Solar has launched New Jersey’s first residential solar energy program. The new leasing program announced by Geoscape Solar is available statewide in which the customers need not pay any upfront costs. The consumers have to pay a monthly fee for the electricity produced by the solar energy system, which is lower than the utility cost. The leasing program was designed to eliminate the upfront costs associated with the purchase of new solar power systems. It not only provides an affordable way for customers to go solar but also saves money.
The commercial operation of a wind farm was commenced by Detroit Edison and Heritage Sustainable Energy, a Michigan-based wind power company. The power generated from the wind farm is enough to power about 2,000 homes of the utility’s customers.
Sunwheel Energy Partners celebrated the commissioning of solar photovoltaic (PV) systems at three affordable housing community sites on January 25, 2010 in San Francisco’s Western Addition and Hayes Valley neighborhoods. The projects created green jobs and bring solar power in addition to providing financial benefits to the owners and residents.
Reportlinker.com announced that it has added a new market research report titled “Wind Turbines in China” to its catalogue.
The U.S. Department of Energy (DOE) has awarded a conditional grant of $22.6 million for the construction of a biomass gasifier project that is being jointly developed by Rentech and ClearFuels Technology. The project is proposed to be constructed at Rentech’s Energy Technology Center in Denver and will be integrated with its Product Demonstration Unit (PDU). Renewable synthetic fuels from biomass will be produced from this project.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.