GE to Supply Frame 9E Gas Turbine to PT Cikarang Listrindo

GE, a company that provides technology and service solutions to the energy sector, has been chosen by PT Cikarang Listrindo, an independent power producer from Indonesia to sustain the power requirements of the fast developing industrial sector.

PT Cikarang Listrindo supplies around 700 MW of electricity to the national power grid and to a number of companies located in five industrial estates of Indonesia.

GE will supply a Frame 9E gas turbine and the required generator to add 114 MW of power to the existing power production capability at Cikarang’s power station, which is situated 45 kms away from Jakarta. The power station will utilize natural gas instead of liquid fuel to support the low carbon efforts of the country to cut down carbon dioxide emissions by nearly 26% by the year 2020.

As per GE calculations, the Frame 9E gas turbine will cut down NOx discharges by 35% and carbon dioxide emissions by 30% in comparison with a similar unit utilizing liquid fuel (distillate). The onsite power generation facility will assist PT Cikarang Listrindo to supply power from a reliable source, while achieving considerable long-term savings. Earlier, PT Cikarang Listrindo has purchased two 9Es and six Frame 6B units from GE for its projects and the present 9E will be the ninth to be supplied by GE. The new unit at Cikarang power production facility is anticipated to start operating from March 2012.

The Frame 9E gas turbine manufactured by GE is a 50-hertz turbine. The company has supplied over 600 such turbine units all over the world. The turbine has accrued over 23 million hours of working in industrial and utility services and in extreme climatic conditions.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Chai, Cameron. (2019, March 01). GE to Supply Frame 9E Gas Turbine to PT Cikarang Listrindo. AZoCleantech. Retrieved on November 23, 2024 from https://www.azocleantech.com/news.aspx?newsID=14909.

  • MLA

    Chai, Cameron. "GE to Supply Frame 9E Gas Turbine to PT Cikarang Listrindo". AZoCleantech. 23 November 2024. <https://www.azocleantech.com/news.aspx?newsID=14909>.

  • Chicago

    Chai, Cameron. "GE to Supply Frame 9E Gas Turbine to PT Cikarang Listrindo". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=14909. (accessed November 23, 2024).

  • Harvard

    Chai, Cameron. 2019. GE to Supply Frame 9E Gas Turbine to PT Cikarang Listrindo. AZoCleantech, viewed 23 November 2024, https://www.azocleantech.com/news.aspx?newsID=14909.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.