Posted in | News | Biofuels

IAC and Adelphi Construction Complete Design-Build Project for Biomass Pellet Plant

Industrial Accessories Company (IAC), along with its fully-owned construction subsidiary, Adelphi Construction, has completed a design-build project for a $6.6M 100,000 ton-per-year biomass pellet plant of Midwest Farmer’s Co-operative.

Several wood and agricultural waste by-products are processed into alternative fuel pellets, packed in bags weighing 40 lbs for the pellet stove market or transferred in bulk to a utility close by in order to co-fire with coal. Carbon credits will be received by the utility company to enable the usage of the biomass fuel pellets.

IAC was the EPC contractor and the fast-track project was done using its in-house design, procurement and engineering and project management teams. Adelphi Construction performed the building works and supplied the labor force.

Along with air pollution equipment, IAC designed and fabricated all the galvanized steel, structural steel access parts, spouting and mating transactions from IAC’s MO fabrication plant at Kansas City. Since IAC is a pre-engineered metal storage and building silo dealer, it offered a competitive and whole package to the client.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Chai, Cameron. (2019, March 01). IAC and Adelphi Construction Complete Design-Build Project for Biomass Pellet Plant. AZoCleantech. Retrieved on November 23, 2024 from https://www.azocleantech.com/news.aspx?newsID=16047.

  • MLA

    Chai, Cameron. "IAC and Adelphi Construction Complete Design-Build Project for Biomass Pellet Plant". AZoCleantech. 23 November 2024. <https://www.azocleantech.com/news.aspx?newsID=16047>.

  • Chicago

    Chai, Cameron. "IAC and Adelphi Construction Complete Design-Build Project for Biomass Pellet Plant". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=16047. (accessed November 23, 2024).

  • Harvard

    Chai, Cameron. 2019. IAC and Adelphi Construction Complete Design-Build Project for Biomass Pellet Plant. AZoCleantech, viewed 23 November 2024, https://www.azocleantech.com/news.aspx?newsID=16047.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.