Valmet to Rebuild Koehler Paper’s Power Boilers in Oberkirch and Kehl, Germany

Valmet will rebuild Koehler Paper’s power boilers at its Oberkirch and Kehl paper mill sites in Germany to increase the production of sustainable energy from renewable sources.

The orders were included in Valmet’s orders received of the third quarter 2022. The value of the orders will not be disclosed. The joint value of such rebuilds and supply scopes is typically around EUR 20 million.

In Oberkirch, Valmet will convert an existing circulating fluidized bed (CFB) boiler from combusting coal to biomass. The delivery will be taken over by Koehler in October 2024. In Kehl, Valmet will supply a fuel upgrade on a CFB boiler, and this delivery will be taken over by the customer in September 2023. With the modification, new fuels – mainly sludges – will be added to the existing biomass fuel portfolio.

By switching from bituminous coal to biomass as the primary fuel for our location in Oberkirch, we will be cutting more than 150,000 tonnes of CO2 emissions a year. By converting away from fossil fuels, Koehler is proactively playing its part in reducing global warming,” says Dr. Stefan Karrer, COO, Koehler Group.

Valmet is serving customers with solutions for decarbonization and sustainable energy production, and we are happy to share the journey toward a carbon neutral future with Koehler Paper,” says Aleksi Salmirinne, Vice President, Energy business unit, Pulp and Energy business line, Valmet.

The combined heat and power (CHP) plant in Oberkirch produces approximately 100,000 MWh of electric power and 330,000 metric tonnes of steam per year for paper production. The Kehl CFB boiler has a 44 MW thermal capacity, and the plant power generation capacity is 9 MW.

Information About Valmet’s delivery

Valmet's delivery scope to the Oberkirch plant includes boiler modifications and external equipment for converting the coal-fired CFB boiler for biomass; a new biomass feeding system, new burners for renewable fuel, additional heating surfaces, ash removal improvement, a selective non-catalytic reduction (SNCR) system and additive feeding for the baghouse filter.

At the Kehl CHP plant, Valmet will modify the existing CFB boiler and deliver equipment to add paper sludge and sewage sludge to the fuel portfolio of the plant. Sludge feeding systems, bottom and fly ash system upgrades, and modifications to superheaters will be supplied for the Kehl boiler.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Valmet. (2022, November 09). Valmet to Rebuild Koehler Paper’s Power Boilers in Oberkirch and Kehl, Germany. AZoCleantech. Retrieved on November 21, 2024 from https://www.azocleantech.com/news.aspx?newsID=32543.

  • MLA

    Valmet. "Valmet to Rebuild Koehler Paper’s Power Boilers in Oberkirch and Kehl, Germany". AZoCleantech. 21 November 2024. <https://www.azocleantech.com/news.aspx?newsID=32543>.

  • Chicago

    Valmet. "Valmet to Rebuild Koehler Paper’s Power Boilers in Oberkirch and Kehl, Germany". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=32543. (accessed November 21, 2024).

  • Harvard

    Valmet. 2022. Valmet to Rebuild Koehler Paper’s Power Boilers in Oberkirch and Kehl, Germany. AZoCleantech, viewed 21 November 2024, https://www.azocleantech.com/news.aspx?newsID=32543.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.