The wind turbine from Urban Green Energy consists of a permanent magnet DC generator that operates in temperature conditions ranging from -40 degrees centigrade to 115 degrees centigrade. The 10kW vertical axis wind turbine incorporates a direct drive technology.
The Swift wind turbine can be mounted on the roof top. The wind turbine is mounted on an aluminium mast. The turbine can generate the maximum power if it is mounted at the highest point of the roof. The damping system in the mounting brackets of the turbine absorbs a range of frequencies.
The ASW-18F-10 evacuated solar hot water collector has a total area of 20.45ft2. It is equipped with 10 tubes and these tubes have a length of 70 inches. The depth of the collector is 5.9 inches. The volume of the fluid present in the collector is 18.9oz.
The ECONAR Vara2 Plus GeoSource heat pump incorporates a coil along with copper tubing in aluminum fins to provide higher heat output in cold climate regions. It incorporates an Allergy Gold filter for a cleaner system.
Canadian Solar has installed the first OPA (Ontario Power Authority) approved microFIT (feed-in-tariff) solar system at its headquarters in the City of Kitchener. The 3.2 kW DC solar system from the company was installed on the office building, which is already a designated green building, that uses half the energy and water when compared to a commercial building.
Germany Trade & Invest will be taking part in the PV Expo being held in Tokyo, Japan from 3rd March to 5th March 2010. Latest and vast opportunities that are available in the German solar market, which is the biggest solar market in the world, will be presented by it at the expo. According to the industry estimates, about half of the solar modules in the world are installed in Germany.
Vulcan Power Company, a geothermal energy projects developer, has recommenced drilling at its Patua geothermal project site located near Fernley, Nevada. An amount of $108 million as second equity investment was received by the company earlier this month.
Europe's research driven clusters in sustainable forest management and wood based industries got new co-operation opportunities within the ROKFOR project which started 23 February 2010. This cooperative action project ‘Sustainable Forest Management Providing Renewable Energy, Sustainable Construction and Bio-based Products' (ROKFOR) will join forces in which five European regions in order to create both individual and regional research agendas and action plans in the fields of renewable energy, bio-based products and sustainable construction.
Following the proposed changes announced by the Federal government in the Renewable Energy Target (RET) scheme, AGL Energy Limited has entered into conditional arrangements for building the Macarthur Wind Farm located in south-west Victoria.
Titan Electric supplies residential roof mounted turbines and commercial mast or tower turbines. The residential roof mount turbines can generate electricity from 1kW to 50kW and the tower turbines can generate electricity from 100kW to 2.5MW. Titan Electric supplies Windterra roof-mounted small-wind turbine systems, which are suitable for homeowners and small-application users. The Windterra ECO 1200 vertical axis wind turbine is available from Titan Electric. The vertical axis wind turbine is suitable for both urban and rural installations.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.