Constellation Energy announced a solar capital commitment of $90 million to support the commercial photovoltaic power systems development. To maximize the value of incentives provided by the government, the $90-million solar capital will be available for solar installations constructed at customers’ location that are 500 kW or above which commence construction earlier than mid-year 2010.
CPV Renewable Energy Company is planning to begin construction of its Keenan II wind farm with the closing of financing for the project. The 152-MW wind project is spread over 8,000 acres and is located in Oklahoma. It is planned for completion by the end of 2010. This facility represents Phase II of company’s plan to develop wind generation project with generating capacity totaling more than 400 MW.
China Hydroelectric Corporation is set to acquire additional hydroelectric projects totaling 78 MW in Yunnan province with the signing of a definitive agreement for acquiring an operating hydroelectric project with a generating capacity of 44 MW. The company is also proposing to acquire additional two operating hydroelectric power projects totaling 34 MW of generating capacity and has entered into memoranda of understandings for that purpose.
CWind, a subsidiary of New World Generation, manufactures wind turbines that are capable of generating more energy than the normal turbines. The CWind turbine has rated power output range from 65 kilowatts to 7.5 megawatts. The conventional wind turbines incorporate a gearbox to transfer high megawatts of wind energy, which is captured by a rotor, to a generator. There was always difficulty in designing and constructing a gear without much weight and cost.
The WP-450W wind turbine is a lightweight model that facilitates easy installation. This turbine produces a power of 450 watts at a wind speed of 12 meters per second. It has the capability to generate a maximum power of 600 watts. The WP-450W wind turbine has a start-up and cut-in wind speed of 2.3 meters per second and 3 meters per second, respectively.
Catacel Corporation, driving reaction system innovation with patented technologies, is the recipient of a 2010 NorTech Innovation Award in the Advanced Energy, Power & Propulsion category. Catacel was one of more than 40 nominees from Northeast Ohio's manufacturing, industrial, medical and innovation industries.
Vestas has received an order from Granite Reliable Power Windpark for the supply of 33 numbers of V90-3.0 MW wind turbines totaling 99 MW. Service and maintenance agreement for a period of two years is also included in the order. Noble Environmental Power owns a majority stake in the 99-MW wind project.
Sway AS, a company based in Bergen, will receive NOK 137 million from Enova for the demonstration of a prototype of a new wind turbine technology. The support from Enova for this project demonstrates its commitment toward renewable energy. The cost of generating power from offshore wind turbines has the potential to reduce significantly through this demonstration project.
The AWE 52-900 wind turbine is available in three versions with 40, 50 and 70 meter high towers. It is also available in two different configurations that are 52-meter rotor diameter for class II wind situations and 54-meter rotor diameter for class III lower wind situations.
AC Solar supplies wind turbines manufactured by Bergey Windpower. The BWC XL.1 wind turbine is an upwind model that consists of three blades made from pultruded fiberglass. This turbine produces a rated power output of 1,000 watts, while the peak power output is 1,600 watts. The BWC XL.1 wind turbine comprises an airfoil that results in an increase in efficiency. It has a rotor in a diameter of 2.5 meters.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.