Southern Company and environmentalist Ted Turner have formed a strategic partnership to develop renewable energy projects in the United States.
Reportlinker.com has added a new market research report titled “Worldwide Solar Cell Manufacturing Facilities and Production Capacity, 2009-2015” to its catalogue.
A new office in Boston was opened by Northern Power Systems. The office will operate as its engineering and commercial center to cater to its wind business throughout the world. Northern Power Systems is a developer of next-generation wind turbines.
Just Energy, one of leading energy retailers in North America, announced that it will be purchasing power from First Wind's Steel Winds I wind energy project, located in Lackawanna, New York. First Wind is a North American wind energy company and is concentrated on developing wind projects in the northeastern and western United States and Hawaii.
Duke Energy is expanding its commercial renewable energy portfolio with the purchase of a large-scale photovoltaic project that is under development in San Antonio, Texas. juwi solar Inc., a Colorado based company, is developing the Blue Wing Solar Project. Duke Energy Commercial Businesses unit, Duke Energy Generation Services (DEGS) will be purchasing the Blue Wing Solar Project.
The participant funding process by the Canadian Environmental Assessment Agency for the proposed Bute Inlet Hydroelectric Project that is to come up in British Columbia is being postponed. The postponement is due to alteration in timelines related with the submission of the Environmental Impact Statement for the project.
Ultra Geothermal provides geothermal designing and installation services. The geothermal system, installed by the company, uses water in the deep standing column wells as the medium for heat exchanging. The well water is used to transfer the heat between earth and home. These deep standing wells also have the ability to provide potable water. Hence, the geothermal system offers hot water supply in addition to space heating and cooling.
At Neal Hot Springs project site, Chevron Minerals drilled and found commercial geothermal resource in a depth of 2,820 feet, during the late 1970s. The Chevron drill hole came upon massive lost circulation of drill fluids and high temperature in the geothermal zone.
The Whisper 100M marine wind turbine consists of three blades made of injection-molded fiber. The CE complaint wind turbine has a cast aluminum housing and comprises permanent magnet alternator. The rotor of the wind turbine has an overall size of 2.1 meters.
The US Department of Energy’s (DOE) National Renewable Energy Laboratory (NREL) released the Eastern Wind Integration and Transmission Study (EWITS), which is a two-and-a-half year technical study that examines high-penetration wind scenarios of the future. The Eastern Wind Integration and Transmission Study was designed to analyze the operational, technical and economic implications of moving Eastern Interconnection’s electrical load amounting to 20% or more to wind energy by the year 2024.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.