The Gaia-Wind 133-11kW wind turbine provided by Gaia-Wind has an oversized, twin blade designed composite rotor unit measuring 13 m in diameter. In upright position the top edge of the rotor extends to a height of 24.8 m and at the lowest point it extends to 11.8 m above the ground.
The Bornay 6000 wind turbine provided by the Bornay Aerogeneradores has a three phase permanent magnet alternator utilizing neodymium magnets. The nominal power of this wind turbine is 6000 W; the rated voltage is 48 – 120 V at a maximum of 600 rpm.
The Endurance S-343 - 5 KW wind turbine provided by the Endurance Wind Power is meant for use in direct grid connected applications. The rated rotor speed of this turbine is 166 rpm. The cut-in wind speed of this turbine is 4.1 m/s, its cut-out wind speed is 24 m/s, and its survival wind speed is 52 m/s.
The AC 752 turbo wind generator station provided by AeroCraft has three blades made of fiber reinforced plastic. The diameter of the rotor blades measure 240 cm and provide a sweep area of 4.50m².
The Falcon 5.5kW vertical axis wind turbine provided by WePower has a rated wind speed of 13 m/s and a cut in wind speed of 2.7 m/s. This wind turbine is designed to withstand a maximum wind speed of 49.6 m/s.
The D400 is a new direct-drive wind generator provided by Eclectic Energy is offered in 12 or 24 volt models.
The PowerSpin TSW 4000 wind power system provided by TechnoSpin incorporates a 4.2 m height rotor weighing 175 kg. This rotor requires a start-up wind speed of 2.5 m/s. The rated wind speed of this turbine is 12 m/s and this rotor is designed to withstand a maximum survival wind speed of 55 m/s.
A power purchase agreement between Hawaiian Electric Company and First Wind subsidiary Kahuku Wind Power has been approved by the Hawaii Public Utilities Commission, under which Hawaiian Electric Company will purchase renewable power to be generated by the 30-MW wind energy project likely to be built on North Shore of Oahu.
Grasslands Renewable Energy has announced certain developments to the company’s Wind Spirit Project based in Montana.
RMT, Inc has been chosen by Noble Environmental Power to engineer and construct the latter’s Granite Reliable Power Windpark in Coos County, New Hampshire.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.